|
Winter
stalling rates ELDORADO
from 1 October 2008 until 1 April 2009. (inclusive V.A.T.)
|
| * BOAT
STALLING INSIDE, MAXIMUM 30 TONS: Gas bottles may not
remain on-board! |
| |
per
mē |
|
46,50 |
- Including lifting,
high-pressure cleaning of hull, use of cradle and return to the
water in spring.
- Maximum door height
7.30 metres
- Working in the
hall is not permitted. Check with the Harbourmaster about the possibilities
for waxing your ship in the spring.
- For clients who
prefer to carry out their own work, please refer to our environmental
policy and make sure to reserve a place in our work / painting room
in time.
|
| |
| * BOAT
STALLING OUTSIDE, MAXIMUM 30 TONS: |
- Including lifting,
high-pressure cleaning of hull, use of cradle and return to the
water in spring.
- For clients who
prefer to carry out their own work, please refer to our environmental
policy and make sure to reserve a place in our work / painting room
in time.
|
6 - 8
mtr. |
|
400,00 |
|
8 - 10 mtr |
|
550,00 |
| 10
- 12 mtr. |
|
650,00 |
| 12
- 14 mtr. |
|
775,00 |
| 14
- 16 mtr. |
|
875,00 |
| 16
- 18 mtr. |
|
970,00 |
| |
| *
BOOT STALLING IN THE WATER: |
- This rate is not
valid for the berths on pier A-B-C-D.
|
up
to 6,5 mtr. |
|
150,00 |
|
6,5 - 8
mtr. |
|
185,00 |
|
8 - 10 mtr. |
200,00 |
|
10 - 12 mtr. |
|
250,00 |
|
12 - 14 mtr. |
|
270,00 |
| 14
- 16 mtr. |
|
300,00 |
| 16
- 18 mtr. |
|
325,00 |
| |
| *
INBOARD MOTORS: |
- Winter maintenance
will be calculated against hourly rate, excluding materials .
|
| *
OUTBOARD MOTORS: |
- Winter maintenance,
excluding materials .
|
Up to 5 pk |
|
85,00 |
| 6
to 20 pk |
|
95,00 |
| 21
to 35 pk |
|
115,00 |
| Over
35 pk |
|
hourly
rate |
| *
BATTERY CARE: |
- Battery charging
on Ship, per battery
- Work time for checks
and maintenance based on hourly rate
|
|
|
12,50 |
| |
- Battery charging
in the workshop
|
Up
to 35 Amp |
|
15,00 |
| Up
to 100 Amp |
|
17,50 |
| Above
100 Amp |
|
20,00 |
| *
GAS BOTTLES: |
- These may not be
left on your boat during winter stalling. Neither the insurance
company nor the fire brigade can allow this. You are required to
remove it and take it home with you, or store it at our gas depository.
|
| *
HOURLY RATE: |
- Extra work will
be calculated against the current hourly rate of
|
51,00 |
| |
| YOUR
ORDER SHOULD BE SENT TO US, SIGNED, AS SOON AS POSSIBLE AND
BY 20 SEPTEMBER 2006 AT THE LATEST, IN CONNECTION WITH THE PLANNING.
|
| |